Peace River pending 98 St. underpass and ramp closure
Mar 21, 2018 | 11:37 AM
PEACE RIVER, AB – Effective March 22, at 9 a.m., Alberta Transportation will be closing the on and off ramps for Highway 2 at 98 Street as well as the portion of 98 Street that crosses under Highway 2. This is all part of the new Peace River Bridge Project.
The closure will last for the duration of the project and the only way on or off the Highway will be 100 Street or Highway 744 near the main street traffic circle.