Construction
City of Grande Prairie conducting sidewalk levelling project
Sep 25, 2024 | 1:00 PM
The City of Grande Prairie has begun a sidewalk levelling project.
Over the next few days, crews will be grinding down raised sections of sidewalks where height differences pose tripping hazards.
The process should take about 10-15 minutes per location, minimizing disruptions to pedestrians and leaving vehicle traffic unaffected.
Grinding down uneven surfaces is a cost-effective approach to creating smoother and safer pedestrian routes compared to full concrete replacement.