STAY CONNECTED: Have the stories that matter most delivered every night to your email inbox. Subscribe to our daily local news wrap.
Photo by Curtis Galbraith
Roads

Repairs start Monday on 99 Avenue bridge

May 14, 2022 | 6:00 AM

The city says upgrades to the 99 Avenue bridge between 102 and 105 Streets will start Monday.

The existing slab over the deck will be replaced. The expansion joints at each end of the bridge will also be replaced.

Cracked concrete will be repaired as will the retaining walls at either end of the bridge.

City Hall says traffic will go down to one lane with detours in place.